Sunday, September 21, 2008

Roof Work Sept 8-15

Yes, more work on the roof continues. The plywood (27 sheets of plywood!) have been installed on the entire main building. (Due to inclement weather the plywood has been covered by tarps, but can be seen on the interior of the building in Photos #1 & 2.) Next up is the installation of the roof underlayment upon which the cedar shingles will be placed in the coming weeks. The fascia boards and overhangs have also been installed on the building (see Photo #3).




Other work focuses on the overhangs and balcony roof on the east and west elevations. On the east elevation overhang, the top sheathing will be replaced with new redwood 1 x4 boards (Photo #4 shows the east elevation overhang prior to work beginning on sheathing.)




Work on the west elevation includes reframing the balcony roof to reflect the original roof slope. Photos of this work will be posted next week.-JK